How soon does mold start in wet building materials?
Faster than most people expect, and the clock runs on the material, not the room. Damp porous material in a closed cavity can support growth within days. This is why wet insulation, pad and drywall are removed rather than left to dry behind a finished surface.
The three conditions are moisture, an organic surface and time, and only the first is under anyone's control. A wall cavity that holds damp fiberglass against damp paper-faced board, with no airflow and a steady temperature, supplies the other two generously. That is the environment a crew is trying to eliminate when it opens a wall that an owner thinks is already dry.
The practical consequence is about urgency rather than alarm. Getting liquid water out and the assembly dried inside the first day or two is what keeps a water loss from becoming a mold job, and it is the strongest argument for calling about a leak early. We do not make health claims on this site; any health question belongs with your own doctor.
Why does the room get sealed off in plastic?
Because removal disturbs growth and sends it into the air. Containment with sheeting, sealed openings and a filtered machine holding the space under slight negative pressure means the air leaves through a filter. Without it, one room's remediation contaminates the rest of the building.
Negative pressure is the part people notice: the plastic sucks inward slightly and air moves into the work area from the rest of the house rather than out of it. Ducts and registers in the work area are sealed as well, since a running furnace or heat pump will otherwise distribute whatever is stirred up to every room it serves.
Can mold be cleaned off, or does the material have to come out?
It depends on whether the surface is porous. Framing, sheathing, concrete and metal can usually be cleaned and kept. Drywall, insulation, carpet pad, particleboard and ceiling tile with growth in them come out, because cleaning the surface leaves what is inside.
Painting or spraying over growth is the shortcut that comes up most often, and it does not work. A coating on top of growth in a porous material hides it and leaves the moisture and the food source in place. Where a crew does use a treatment or a sealer, it is after removal and cleaning, on sound material, and it is not a substitute for either.
Should I have the building tested first?
If you can see growth and you know where the water came from, testing often tells you nothing you need. Where the source is unclear, where a dispute is involved or where someone wants an independent result, an assessment by a party that does not do the remediation is the honest way to get one.
The reason to prefer an independent assessor is simple: whoever writes the report should not be the one who gets paid for the work it recommends. A restoration crew can and should tell you what it can see and what its meters read, and should say clearly where that stops being an assessment.
It is also worth checking who you are hiring. Contractors in Washington register with the Department of Labor and Industries under chapter 18.27 RCW before bidding, advertising or working, registration requires a bond and insurance, and an unregistered contractor cannot sue to collect. You can check a contractor's registration on L&I's website, and it is a reasonable thing to do before anyone opens a wall.
What makes a mold job larger or smaller here?
The area affected, how many assemblies and materials are involved, whether a crawl space or multiple rooms are in it, how hard the space is to contain, the age of the building and whether the moisture source is fixed. Scope and price are agreed before work starts.
Age adds steps rather than surprises. Older buildings hold more layers and more unknowns, and pre-1978 construction raises questions about lead-safe work practices and about asbestos surveys before suspect materials are disturbed, which a registered contractor should resolve for your building. Expect a written scope, the reasoning behind each line, and your approval before anything is opened; figures are discussed directly rather than published.